Flood Consequence Assessment Reports

Welsh Based Flood Consequence Assemment (FCA) Management Consultants

"We are a specialist Flood Risk Management Civil Engineering Consultancy practice operating nationally within the United Kingdom."

FCA Reports for development sites in Wales.

Civil Engineering Solutions have been preparing Flood Consequence Assessment reports since 2006.  We have supported developments throughout Wales by preparing FCA’s to comply with Technical Advice Note 15 (TAN15) and Natural Resorces Wales (NRW) requirements.

We provide Developers, Architects and Planning Consultants with a full range of flood risk management reporting.  This can range from initial Flood Consequence Assessment advice for pre planning applications as well as preparing full FCA reports for your development.  No development is too large or too small.

Our FCA services can include desktop assessments through to full scale flood modelling if needed.  Each FCA we undertake is unique to your particular development and tailored as such.

Reports can be prepared quickly if your development has time constraints.  Our normal service will include consultation with Natural Resources Wales (NRW).  It can take them 20 working days  to respond to our data requests, resulting in a 4-6 week process.  If your site is time sensitive, please contact us to see what can be done to speed up the timescale.

Flood Consequence Assessment Reports

CES are a Welsh Based Flood Management Consultancy Practice based in Eryri National Park and can support your development though the planning process.  We deal with all aspects of flood assessment and reporting for developments located throughout Wales and the United Kingdom.  

Please call us on 01341 421911, Email us or use the contact form and we will get in touch to discuss your requirements.

Site Specific Flood Consequence Assessment reports to support your development through the planning process.